D6D Bulldozer Segment Group/Teeth Sprocket Segment For Bulldozer Parts China Bulldozer Segment exports to Kyrgyzstan
Sometimes the machine’s sprockets or segments are sharp, but the track links appear to be in reasonable condition. We are frequently asked whether the sprockets still need to be changed. The only reason why a sprocket becomes sharp is through the chain’s increased pitch. An increase in pitch creates more play between the pin and the bushing. As a result, the chain’s bushing no longer runs in line with the hollow part of the sprocket. This causes wear on the sprockets and the points become sharp. So never only replace a sprocket. If a track drive sprocket from an excavator with dry chains needs to be replaced, then the track links should always be replaced as well, and vice versa.
Because bulldozers carry out a lot of mobile work, they need oil lubried chains in combination with segments. The wear of the segments is usually found in the cup between the segment points. The pitch can only increase when the oil lubried chain leaks, and the points of the segments will then become sharp. If the oil lubried chain does not leak, then it is better to replace the segments before the end of the cycle; that way the undercarriage can be used for a few hundred more hours.
Brand | Vehicle Type | Appliion Model |
ERPILLAR | Bulldozer | D4C,D4H,D5C,D5M,D5H,D6D,D6M,D6H, |
D7D,D7G,D7H,D7R,D8N,D8L.D8R,D8T, | ||
D9N,D9T,D9R,D10N,D10T,D10R etc. | ||
Excavator | 305D,305E,306D,306E,307C,307E,308C, | |
312D,313D,315D,315C,320C,320D,323D, | ||
324D,325C,325D,329D,330D,345D etc. | ||
KOMATSU | Bulldozer | D50,D53,D55,D57,D60,D61,D65, |
D85,D155,D275,D355,D375,D475 etc. | ||
Excavator | PC60,PC70,PC75,PC90,PC100, PC120, PC130, | |
PC200, PC220, PC270,PC280,PC300, | ||
PC360,PC400,PC600, PC650,PC850 etc. | ||
SHANTUI | Bulldozer | SD08, SD13, SD16, SD22,SD32, SD42,SD52 etc. |
HITACHI | Excavator | EX100, EX110, EX120-1,2,3,5, EX200-1,2,3,5, |
EX220-3,5, EX270,EX300-3,5, EX330, EX370, | ||
EX400-3, ZX200, ZX270, ZX330, ZX450 etc. |
1. You are a trader or a manufacture?
We are an industry and trade integration business,
The factory is loed in the high-tech zone of Nanan City, and the sales department is loed in the center of QuanZhou, about 30 minute.
2. How can I be sure the product is right for my machine?
Please provide the part number of our product or the serial number of the machine. And we can customize for you according to drawings and sizes.
3. How to choose payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your MOQ?
It depends on the product you ordered. We can LCL or 20ft container for you
5. What is your delivery time please?
If the goods are in stock, we can arrange delivery and transportation for you in 2-5 days. If it needs to be produced, it will take about 10-20 days.
6. How is the quality of the product?
We have a perfect quality system to produce perfect products. And we can provide customers with products suitable for customers according to their requirements.
Whatsapp:+8618815997882 Email:jhx@excavatorreliefvalve.com